Trusted by
Scale-up QA results for DeviQA clients
When regression, unreliable automation, or QA capacity slows product growth. Explore how DeviQA teams supported more frequent releases, expanded coverage, and scaled with development teams across 18 published client stories.
Mint
Release bottleneck · Advertising platform
4–5
releases per day, up from one every 1–2 months
QA embedded across 15+ squads, with a production-like UAT environment and feature delivery in two weeks at most.
- 21 QA engineers · 800+ releases
- Clear QA ownership across squads
Tipalti
QA capacity · Global payment automation
1 to 20
QA engineers as the engagement scaled over 12 years
A team that grew with the product, supporting 250+ releases and testing 1,500+ features.
- 20 manual QA engineers
- 10+ in-house QA engineers trained
Childcare platform
Regression bottleneck · Release frequency
1 to 10+
deployments every two weeks
Regression reduced from 3+ hours to 30 minutes, with a 10-minute smoke run and parallel execution in CI.
- 14 parallel threads
- Distributed load tests simulate approximately 1,000 users
More growth bottlenecks addressed
Grover
QA through growth to five markets
90% coverage · 600+ automated tests
From no QA process to four localizations
Company grew to 400+ employees
Xola
6 applications validated in approximately two hours
1–2 production releases per working day
From unstable releases to six CI pipelines
75% of defects caught during development
Compass
40+ minutes → 10-minute pull-request checks
85% coverage · Regression: 7 days → 2 days
QA embedded in each development team
4,000+ feature tickets verified
Agorapulse
15% → 90–95% automated
Approximately four-hour regression every morning
Unmaintained suite rebuilt on Playwright
Release decisions based on automated results
ChargeAfter
2 weeks → 6-hour regression
Approximately 10-minute API suite after each pull request
4,000+ UI & API tests
Smoke checks every two hours
Allego
70+ hours → 18-hour regression
5,000+ automated scenarios
Unstable mobile framework replaced
2.5× more critical defects found
Soapbox
Stories move twice as fast
Regression: 1.5 weeks → 3 days
40% → 90%+ coverage · 95+ releases
Android app supported from prototype to launch
GoodShape
95% fewer defects after core system updates
3× faster release cycles
3,800 automated scripts
Suite maintained through a major upgrade
QIMA
3–4 days → 1–2 days of release testing
2.5× faster test execution
Outdated suite upgraded · API-based test data
k6 performance tests in every release
- Motion
From zero coverage to 75+ automated tests and 90% of critical features covered in five months, with one QA engineer.
- Sprinklr
A framework rebuilt by seven engineers, with 50% less testing time and 2,000+ tests at 90%+ coverage.
- Renhead
Legacy Selenium migrated to Cypress, with regression reduced from 12+ hours to four hours and CI/CD introduced, then moved from Jenkins to GitLab.
- Planetly
From manual regression to 400+ end-to-end tests and regression under one hour, across preview, staging, and production pipelines.
- Favro
250+ releases supported over five years by two QA engineers, who also trained external junior QA.
- CipherHealth
240+ releases supported and 35% fewer production defects in the first seven months, with automation built across web, mobile, API, and load testing.
The scale-up QA
gap
Your engineers can't catch everything anymore. Enterprise buyers want SOC 2 and SLAs. The bar that worked for 50 customers won't hold for 500.
Hiring takes nine months. Agencies send juniors. You need something in between.

The four signs you're ready for
scale-up
Ready to
scale-up

Your best engineers are stuck fixing bugs
Senior devs are triaging issues instead of shipping features. Your strongest people are your slowest bottleneck.

Regression takes longer than the work itself
A two-day change waits five days to ship. Velocity has dropped and no one knows exactly why.

Enterprise deals keep stalling
Security and compliance questions are slowing sales down. You don't have the answers buyers expect.

Your CI/CD can't be trusted
Builds fail for unclear reasons. Engineers re-run pipelines on autopilot. The test suite has stopped being useful.
How we think about QA for scale-ups
QA at 20 people and QA at 500 people are different disciplines — and the gap between them is where scale-ups lose a year. Our framework closes it in quarters, not years. You start at the phase that matches your reality.
- Audit what ships.
- Eliminate flaky tests.
- Establish a single source of truth for test coverage, defect rates, and release health.
- Triage the known regression surface and document it.
A trusted baseline. Your team stops debating whether the suite is reliable.
- Build the automation layer around the baseline.
- Integrate testing into CI/CD at the right gates.
- Define a test strategy across unit, integration, API, E2E, and performance.
- Introduce test data management and environment parity.
A repeatable system. Regression time drops. Release confidence stops being a vibe.
- Embed QA into the release rhythm.
- Unlock enterprise-readiness: SOC 2 evidence, HIPAA, PCI DSS, load and resilience testing, accessibility.
- Hand off ownership models that work whether you grow in-house QA later or keep the partnership.
QA becomes a growth enabler — not a release gate.
QA services built for scale-ups
Five capabilities. One team. Deployed to your release cycle.
Test automation engineering
Playwright, Cypress, WebdriverIO, Appium, REST Assured. Maintainable frameworks, not throwaway suites. Selenium-to-Playwright migrations in 4–8 weeks — with more coverage, not less.
CI/CD integration & shift-left testing
We integrate testing into GitHub Actions, GitLab CI, CircleCI, Jenkins, and Azure DevOps at the gates that actually matter. Pre-merge, pre-deploy, post-deploy. We build the feedback loops that catch regressions in minutes, not release windows.
Performance, load & security testing
k6, JMeter, Locust for load and stress. OWASP-aligned security testing including API and auth layer. SOC 2, HIPAA, and PCI DSS evidence generation as part of the delivery — not a separate, reluctant add-on.
Mobile & cross-platform QA
Native iOS, Android, React Native, Flutter. Device lab coverage across the 25+ configurations that matter for your user base — not a generic cross-browser matrix. Appium, XCUITest, Espresso, and exploratory testing on real devices.
Specialized testing for modern stacks
AI/ML model testing built around our proprietary DeviQA AI Integrity Framework. Data pipeline and ETL validation. Microservices contract testing. Event-driven architecture testing. Observability-linked quality engineering.
QA services at the level your product deserves

Collaboration models
Three ways to work with us. Pick the one that matches your moment.
Staff augmentation
Individually matched senior QA engineers, onboarded to your stack in under 2 weeks.
Advantages:
Your lead keeps full control of strategy and process
Flex capacity up or down per sprint
Senior-only bench, no junior padding
Best for:
You have a QA lead and need to close a capacity gap quickly.
QA outsourcing
End-to-end ownership of your QA function — strategy, execution, reporting, tooling. We run it; you review the outcomes.
Advantages:
Zero internal QA management overhead
Full framework, tooling, and reporting included
SLA-backed delivery with clear quality metrics
Best for:
You want to hand QA off entirely and focus engineering on shipping.
Dedicated QA team
A QA pod (3–15 engineers) embedded in your release rhythm. A dedicated lead. A quarterly roadmap.
Advantages:
One accountable team, one point of contact
Deep product knowledge that compounds over time
Predictable monthly cost, no hiring overhead
Best for:
You need sustained capacity and a full framework applied to your product.
What actually happens in your first quarter with us
We don't believe QA engagements should take six months to produce value. Here's the concrete deliverable schedule for a typical Dedicated QA Team engagement — audit through first automated release gate.
- Week 1: Stack audit, test inventory, defect history review, release rhythm mapping.
- Week 2: Scale Readiness phase assessment delivered to your leadership team.
- Week 3: Flaky-test elimination. Coverage baseline established.
- Week 4: First quick wins in production — usually 10–20% regression time reduction within the month.
- First automation framework live in CI. Core regression suite automated.
- Test strategy documented: layers, ownership, coverage targets.
- Environment parity and test data management addressed.
- Full CI/CD integration with release gates at the right checkpoints.
- Performance and security testing introduced as recurring workstreams.
- Metrics dashboard live: defect escape, coverage, cycle time, MTTR.
- Quarter 2 roadmap delivered with compliance, load, or mobile streams scoped in.

Build the QA function your product
deserves
Three phases. One framework. Starting at the stage you're actually in.
Questions & answers

Still have a question?Talk to us